E.M. Part - II
i)E.M. Part-II shall be filed within 2 years after starting of the activity and for which E.M. Part-I has been acknowledged.
ii)E.M. Part-I is invalidated if E.M. Part-II not filed within the period specified above.
iii)DITC will issue acknowledgement for filling E.M.Part-II after confirming that the enterprise has taken all the effective steps like installation of machinery and equipments, obtaining power/water connection etc. and that the enterprise has gone into commercial production, and has produced all the necessary NOC’s, Documents/Clearances from the concerned authorities as per the check list mentioned in Annexure I.
iv)E.M. Part-II is to be filed by the entrepreneur complete in all respects in the prescribed format costing Rs.50/- to the Directorate of Industries, Trade and Commerce
v)Application for E.M. Part-II received at the Facilitation Counter is verified thoroughly by the Industries Inspector/Extension Officer (Industries) and if any deficiency is observed, the entrepreneur is directed to furnish the remaining documents/information.
vi)The Industries Inspector/Extension Officer (Industries) inspects the unit for physical verification of the machinery, equipments and other assets of the factory/unit, verification of the documents, etc.
vii) Inspection report is submitted within a period of 15 days, along with all the documents to the General Manager (DIC), Directorate of Industries, Trade and Commerce, Panaji.
viii)If the report and documents are found in order after the scrutiny, acknowledgement for filling E.M. Part-II is issued.
|